The People of America's Oil and Natural Gas Indusry

Energy’s Benefits for America

Mary Leshper

Mary Schaper
Posted October 24, 2014

6 Massive Projects Completed Faster than the KXL Pipeline’s 6 Year Permitting Process

Friends of U.S. Chamber of Commerce Blog: American free enterprise can achieve almost anything. But, only if we allow it to work properly (this requires a nimble regulatory environment and a streamlined permitting process). One stark example of this gone wrong is the increasingly evergreen example of the Keystone XL pipeline, a project that is projected to create 42,000 new jobs and generate 4 billion in economic activity. So far, we've waited 6 years for a response on the permit request.

Studies have been conducted. Talking heads and scientists have hashed out all the pros and cons. And despite broad affirmation and support, the American people are stuck waiting for Washington to act. Six years is a disgrace; bigger things can be done in far less time.

Read more: http://bit.ly/1tR3arD

More industry news:

ABOUT THE AUTHOR

Mary Schaper is a Digital Communications Manager for the American Petroleum Institute. She previously worked on Capitol Hill for the Senate Energy and Natural Resources Committee as Digital Director and for Senator Lisa Murkowski. Before coming to D.C., she spearheaded digital strategy for Murkowski's successful Senate write-in campaign in 2010. Schaper enjoys traveling and taking in the local culture alongside her husband, their son and loyal springer spaniel.